Senior Civil/Structural Drafter - Substation
Location
Chicago, IL
Wage
$80,000 – $100,000/yr
Employment Type
Full-time
Posted on September 2, 2026
Location
Chicago, IL
Wage
$80,000 – $100,000/yr
Employment Type
Full-time
Posted on September 2, 2026
GFT is seeking a Senior Civil/Structural Drafter - Substation to join their expanding Power Group. This hybrid position involves engaging in cutting-edge projects that enhance energy infrastructure, focusing on power transmission, distribution, and renewable energy solutions.
At roughly $43/hr, this posting comes in about 21% below the $55/hr median for structural welder jobs in Chicago, IL, where the middle half runs $43–$63/hr across 11 postings with published pay. Put another way, it pays more than about 36% of the comparable postings we have wage data for. That gap is worth raising directly — in a market this size there is normally room to negotiate toward the median, particularly if you already hold the certifications the posting asks for.
We're tracking 103 other active welding openings in Chicago, IL right now, from 64 different employers. 37 of them were added in the last week. Across Illinois as a whole we're tracking 367 other active welding openings from 237 employers. A metro this active generally means you have real leverage — employers here are competing for the same welders. Browse every welding job in Chicago, or widen the search to Illinois.
The most active employers in Illinois at the moment, by number of open welding reqs, are Staff on Site (13), S&C Electric Company (12), and Gerber Collision & Glass (11). Volume like that usually means either a genuine expansion or a staffing agency working several client sites — worth knowing which before you apply.
Within Illinois, the best-paying metros we track by median hourly rate are Chicago at $38/hr, Itasca at $36/hr, and Downers Grove at $36/hr. Chicago is among them.
Pay figures are medians computed from live postings in the Welding Pros index, not from survey data, and they move as employers post. Senior Civil/Structural Drafter - Substation figures were last recalculated when this page was built.